
Later last year the number of CHP units produced by TEDOM reached a serial No. 2000. This unit was intended for Kazakhstan company - Turgai Petroleum. The scope of supply of this power plant includes the units in container version for a factory for utilization accompanying gas placed on in Kumkol oil field in mid Kahakstan. The total output of this power plant is 8MWe. The scope of supply includes TEDOM CHP units in container version, transformers for technology supplying, VN switchboard, control room, transformers of its own consumption and NN switchboard. Currently all containers are on the way to the place on installation. The installation will be started at the beginning of March and is planned to be finished in May 2009. This project put put the accent on the construction to meet climate conditions (the range of temperature is from +45°C till -45°C). According to dusty conditions and snow disasters the power plant must be placed on 1,2 m high pilots. Photos of this project are available in our Photogallery section.